Case studies

Spectris products help customers to improve product quality and performance, increase productivity and yield and reduce downtime and waste.

The following case studies are examples of Spectris products delivering real customer benefits. These case studies will be updated regularly to show a wide range of applications and industries.

Reducing product development times
Brüel & Kjær's data acquisition system has reduced the time Renault spend on measuring an engine from five days to one or two days.
» Find out more

Increasing profitability for Chinese tissue maker
BTG's Duroblade high-performance creping blades have improved productivity and quality for a large tissue manufacturer in China.
» Find out more

Making transport more environment-friendly
Brüel & Kjær's noise analysis systems have enabled improvements to be made to the design of Japan's Bullet Train to reduce environmental noise.
» Find out more

Reducing waste in the production line
Tracking the production of printed circuit boards with Microscan's bar code scanners has increased production and reduced wastage.
» Find out more

Generating power from renewable resources
Using Brüel & Kjær Vibro's machine condition monitoring systems has led to a reduction in machine downtime and maintenance costs at hydroelectric plants in Brazil.
» Find out more

Reducing chemical use in paper production
Using BTG’s instrumentation has resulted in higher productivity and significant savings for a leading paper manufacturer.
» Find out more

Improving process control at Corus
Steel maker Corus is using PANalytical’s X-ray equipment to automate the analysis of iron, steel and slag, yielding better quality steel, tight process control and eliminating rejects.
» Find out more

Noise analysis reduces development costs
Tyre manufacturer Pirelli has shortened development times for new tyres by around three months using Brüel & Kjær's noise analysis equipment.
» Find out more

Reducing costs in the power industry
A Servomex gas analyser demonstrates how fuel costs at a coal-fired power station can be reduced.
» Find out more